Using Steps

Hide Topic ContentsShow Topic Contents
    1. Procedure

Inspection Steps allow a highly complex inspection procedure to be broken down into more manageable steps. The operator must begin with the first inspection step and cannot proceed to the next step until the previous step has been completed. Completion will be accomplished by answering all checklist questions assigned to the step.

Inspection Steps are assigned to a Setup which, in turn, is assigned to one or more stations.

A filmstrip control helps the user to visualize where they are in the overall inspection process.

Inspection steps have a visual indicator to describe status: completed (green) and incomplete (red). If the Inspection step contains an image, it will be displayed in the control.

Inspectors may logout at any point during the inspection process and the current inspection step will be saved. Any inspector will be able to login and pull up the same unit and continue the inspection at the point where the previous inspector left off.

Each inspection step may include checklist questions, views, view categories and part categories.

Procedure

Update steps procedure

Inspection steps are used as follows:

Login to Data Collect.

You will be presented with the first step that needs to be completed; that is, the first step for which all the checklist questions have not been answered.

The % indicator on each step shows the percentage of the questions that have been answered.

Enter any existing defects.

Answer all checklist questions.

When you have completed 100% of the questions in a step you can progress to the next step.